Chimney Tops Trail
Showing posts with label Chimney Tops Trail. Show all posts

Foreign Visitor Fractures Leg on Chimney Tops Trail

Tuesday, April 15, 2014

1 comment
Last week Kathy and I spent several days hiking in the Smokies. On Tuesday, our first day in the park, we decided to hike the Chimney Tops Trail. As we were putting our gear together I noticed three people standing near Newfound Gap Road trying to flag someone down. They were finally able to stop a road construction vehicle, and after a few seconds, the truck sped away. I had no idea what was going on, so I continued packing my backpack.

One of girls among this group noticed we were getting ready to take off, and approached us. She told us there was a woman on the trail who broke her leg and needed a rescue. She wanted us to tell the woman that emergency services had been contacted, and help was on the way.

As we climbed up the trail we found out from hikers coming down the mountain (the old information superhighway) that the woman was from Italy, and didn't speak a word of English. Finally, after hiking about a mile-and-a-half up the trail, on one of worst sections of trail in terms of rocks, uneven surfaces, mud and water, we finally reached the injured woman. She was sitting on a rock with her husband, who didn't speak any English either. Fortunately they were with a companion who spoke a little English, at least enough to get by. There was also a woman there that had some advanced first aid training. She told us the woman, likely in her 60s, suffered a compound fracture of her lower leg (tibia). Believe it or not, but the injured woman was hiking the trail in ladies flats!

After relaying our information that help was on the way, and making sure that she had enough clothes to keep herself warm, or seeing if she needed any Ibuprofin, we continued towards the summit. After about a half-hour or so we began our return trip back down the mountain. By that time emergency personnel had already arrived, and were just beginning to move her down the mountain on a stretcher. Interestingly, the stretcher had a mountain bike wheel attached to it, allowing the rescuers to move fairly rapidly down the mountain. In fact, they were moving almost as fast as we were.

We arrived back at the trailhead at almost the same time as the rescue party. Here they transported the woman to an ambulance. In addition to local emergency medical personnel, the Great Smoky Mountains Search and Rescue operations team played a major part in the rescue as well.

We couldn't help but think that this family had to be extremely disappointed in having to deal with a situation like this while traveling abroad. Hopefully the woman is doing much better now, and is already at home.

As a result of this hike we have updated the Chimney Tops Trail page on our website.


Jeff
Hiking in the Smokies
Read More

Chimney Tops Trail Bridge Repair Complete

Thursday, July 4, 2013

2 comments
Great Smoky Mountains National Park crews completed bridge repairs on the Chimney Tops Trail. The popular trail is now open to the public through the Fourth of July holiday weekend.

The trail has been closed since late January when high flood waters destroyed the pedestrian bridge. On January 30th, the park received more than 4 inches of rain in a 24-hour period. The 70-foot long pedestrian bridge, which spans the Walker Camp Prong at the beginning of the trail, was originally built in the late 1950s:

Crews have worked efficiently over the last several weeks to replace the 70-foot long bridge and allow safe access to the trail. Skilled crew members replaced the specially ordered 70-foot bridge beams, repaired the stone pylon structures in the river, and completed the wood deck using primarily hand-operated equipment and pulleys to construct the bridge in an environmentally sensitive area.


Here's what the new bridge looks like now, as completed:

Beginning Monday, July 8th, the Park’s Trails Forever Crew will begin Phase 2 of the ongoing full trail rehabilitation on Chimney Tops Trail which necessitates closing the trail each Monday at 7:00 a.m. through Thursday at 5:30 p.m., through October 17th, while the trail continues to undergo a major facelift. The trail will be open weekly from Friday through Sunday during the rehabilitation project.

For more information about trail closures, please visit the Park’s website or call the Backcountry Information Office at 865-436-1297.

For more information on hiking the Chimney Tops Trail, please click here.


Jeff
Hiking in the Smokies
Read More

Updates on Flood Damaged Trails in the Smokies

Tuesday, April 23, 2013

3 comments
Great Smoky Mountains National Park crews are making needed repairs on both Chimney Tops Trail and Noland Creek Trail which received significant flood damage this winter.

In Tennessee, the popular Chimney Tops Trail has been closed since January when high waters destroyed the pedestrian bridge across Walker Camp Prong at the beginning of the trail. Crews are working to replace the 70-foot long bridge to allow trail access and estimate reopening the trail by June 30th, 2013. At that time, the Park's Trails Forever Crew will begin Phase 2 of the ongoing full trail rehabilitation which will necessitate closing the trail each Monday through Thursday from Monday, July 1 through Thursday, October 17, while the trail continues to undergo a major facelift.

In North Carolina, Park crews will repair a slide area along Noland Creek Trail. In order to make the needed repairs, the trail will be closed to all hiker and horse use from April 22 - May 2, 2013 from the trailhead to Backcountry Campsite 64. Note that Campsite 64 will remain open, but Backcountry Campsite 65 will be closed during the project.

During the January 30th storm, the Great Smoky Mountains received more than 4 inches of rain in 24 hours, resulting in flooding of streams throughout the park which were already swollen from higher than normal precipitation throughout the month. Average rainfall during January across the Smokies usually averages 5-7 inches of rain, but the park received 14-17 inches of rain during the month.

Other backcountry closures you should be aware of include:

• Beard Cane Trail and campsites #3 and #11
• Hatcher Mountain Trail
• Scott Mountain Trail from campsite #6 to Schoolhouse Gap (campsite #6 is open)
• Backcountry Campsites 3, 11, 40, 54

For more information about trail closures, please call our Backcountry Information Office at 865-436-1297.





Jeff
Hiking in the Smokies
Read More

Major Progress being made on Chimney Tops Trail

Tuesday, July 31, 2012

No comments
Christine Hoyer from the Trails Forever program recently posted a couple of photos highlighting some of the progress being made on the Chimney Tops Trail. It looks like they are making some major improvements, and I'm really looking forward to hiking up there once the project is completed.

The combination of heavy use, abundant rainfall, and steep terrain had turned the trail into a badly eroded obstacle course of slick, broken rock, exposed tree roots and mud. The hazards that existed on the trail encouraged hikers to pick their way across the uneven surface or to divert them off the edges of the trail, thus causing extensive erosion and resource damage.

The Park's Trails Forever Crew is currently rebuilding the trail using rock and timber. Work includes: constructing rock steps to carry hikers up the steepest areas and to prevent erosion; building elevated "turnpikes" - logs laid parallel and packed with dirt to carry the trail across wetland areas, and creating numerous "waterbars" - logs or stone partially buried diagonally across the trail to divert rainwater off the trail before it can erode the walking surface. Park managers say that the extensive use of durable stone and rot-resistant black locust timbers in the reconstruction will stabilize the trail for decades to come, reducing annual maintenance, and greatly improving the visitor experience.

Through October 18th, the trail is closed each Monday through Thursday while crews give the trail a facelift.

To see all of the photos posted on the Trails Forever website, please click here. For more information on hiking the Chimney Tops Trail, please click here.


Jeff
Hiking in the Smokies
Read More

Chimney Tops Closure: Two Years or Just One?

Wednesday, April 25, 2012

5 comments
Last week officials from Great Smoky Mountains National Park announced additional details on the upcoming Chimney Tops reconstruction project. As has been known for several weeks now, the popular trail will be closed each Monday through Thursday, from April 30th through October 18th. However, I thought the most intriguing piece of news from the park press release was the fact that the project will take two seasons to complete.

My guess is that the vast majority of people that hike this trail already do so on the weekends, so this will have little or no impact on them. However, there is a certain percentage of people that will have to make other arrangements, not only this year, but next year as well.

My question for all of you is if you think that the hiking community, park visitors, work crews, and even the park itself, would've been better served by shutting down the entire trail everyday this year, and possibly knocking out the much needed project in only one season? I'm sure there was debate among park management about this issue, but the public was never brought into that discussion.

What are your thoughts?


Jeff
HikingintheSmokys.com
Read More

Smokies releases more details on Chimney Tops Project

Friday, April 20, 2012

No comments
Officials at Great Smoky Mountains National Park have announced that the popular Chimney Tops Trail will be closed each Monday through Thursday from Monday, April 30 through Thursday, October 18 while the trail undergoes a major facelift. The Chimney Tops Trailhead is along Newfound Gap Road about 8 miles south of the Park's Gatlinburg, TN entrance. The work is expected to take two seasons to complete.

The combination of heavy use, abundant rainfall, and steep terrain has turned the Chimney Tops trail into a badly eroded obstacle course of slick, broken rock, exposed tree roots and mud. The hazards that now exist on the trail encourage hikers to pick their way across the uneven surface or to divert them off the edges of the trail, causing extensive soil erosion and resource damage.

The Park's Trails Forever Crew and will be rebuilding the trail using rock and timber. The planned work includes: Constructing rock steps to carry hikers up the steepest areas and prevent erosion; building elevated "turnpikes" - logs laid parallel and packed with dirt, to carry the trail across wetland areas, and creating numerous "waterbars" - logs or stone partially buried diagonally across the trail to divert rainwater off the trail before it can erode the walking surface. Park managers say that the extensive use of durable stone and rot-resistant black locust timbers in the reconstruction will stabilize the trail for decades to come, reducing annual maintenance, and greatly improving the visitor experience.

According to Tobias Miller, the Foreman of the Park's Trails Forever Crew," Because of the narrow trail corridor, and steep drop-offs along the edges of the trail, we could not get the work done safely or efficiently with hikers streaming through. Much of the needed work involves moving and breaking large rock which will require extensive rigging of cable systems that will make the trail virtually impassable. Trying to accommodate hikers through the work zones with this type of work underway would be hazardous."

The Park is scheduling the work so as to allow the Chimney Tops Trail to be re-opened for peak visitor use each Friday through Sunday. During the closure days the Park is suggesting alternative trails including: Alum Cave Trail which is two miles south of Chimney Tops along Newfound Gap Road, the Appalachian Trail north to Charlies Bunion, the Rainbow Falls Trail from the Cherokee Orchard Road to the falls, or the Forney Ridge Trail from the Clingmans Dome Parking Area two miles to Andrews Bald. Park managers are especially encouraging people to hike the Forney Ridge Trail, because until recently it had the same sort of problems as the Chimney Tops Trail and is an example of the kind of work that is ongoing at Chimney Tops.

The Park's Trails Forever Crew is funded through a partnership between the Park and the Friends of the Smokies. The Friends are donating $121,000 this year to support the program.

The Park's professional Trails Forever crew will also be reinforced by volunteers who sign up to work with the crew on scheduled workdays, as individuals or part of organized groups. The Park invites interested trail work volunteers to visit the Trails Forever website or contact Trails & Facilities Volunteer Coordinator at (828) 497-1949 for more information.


Jeff
HikingintheSmokys.com
Read More

Trails Forever to Focus on Chimney Tops Trail This Year

Wednesday, April 18, 2012

4 comments
The latest edition of the Friends of Great Smoky Mountains National Park Newsletter is reporting that the Chimney Tops Trail will be the primary project for the 2012 Trails Forever Crew. This trail rehabilitation project will stabilize and improve the trail conditions to protect the resources and enhance the visitor's experience.

The Chimney Tops Trail will be closed Mondays through Thursdays from April 30th through October 18th while this work is in progress. The volunteer workdays for this project will begin in May.

To support the work of the Trails Forever crew, you can donate online at any time through Friends' website. And through a matching grant from the Aslan Foundation of Knoxville, your dollars will be doubled.

Beginning on May 23rd, you can also help by joining the crew on Wednesdays throughout the year.

Volunteers will work to complete a variety of trail rehabilitation tasks. There will be a limit of the number of volunteers for each of the workdays and you must sign up in advance to volunteer. Once you sign up and secure a spot for one of the workdays, you will receive more details. To sign up, contact Christine Hoyer, Trails & Facilities Volunteer Coordinator at 828-497-1949 or christine_hoyer@nps.gov.



Jeff
HikingintheSmokys.com
Read More

Chimney Tops Trail Closures / Other Trail Alerts

Thursday, March 1, 2012

No comments
Managers for the Great Smoky Mountains posted an alert on their website stating that the Chimney Tops Trail is tentatively scheduled to be closed for trail rehabilitation on Mondays through Thursdays, from April 30 thru October 18, 2012.


They also posted these trail alerts:

• Caldwell Fork Trail - several footbridges along the trail are damaged. Hikers wishing to use the trail will need to ford the creek. The foot bridge located between the trailhead and the second junction with the Boogerman Trail is out and is scheduled for repair in May.

Smokemont Loop Trail/Bradley Fork Trail - the foot bridge located at the junction of these trails is out and scheduled for repair in May.


And of course, these three trails remain closed:

• Beard Cane Trail closed due to tornado damage

• Hatcher Mountain Trail North of its intersection with Little Bottoms Trail closed due to tornado damage

• Gunter Fork Trail closed due to landslides

For more information on temporary road and trail closures, please click here.






Jeff
HikingintheSmokys.com
Read More

Conquering the Chimney Tops

Sunday, November 15, 2009

1 comment
Another fine video from the Great Smoky Mountains Association. The video is about the ins and outs of climbing one of the most popular hikes in the Smokies:



For additional information about hiking the Chimney Tops Trail, please click here.



Jeff
HikingintheSmokys.com

Smoky Mountain Rental Cabins Cabin and chalet listings in the Smokies.
Read More