Road
Showing posts with label Road. Show all posts

Single lane closures on Newfound Gap Road

Tuesday, February 15, 2011

No comments
The Great Smoky Mountains announced today that there will be single lane closures between mile marker 13.5 and 14.2 on Newfound Gap Road (US-441) for almost 3.5 months this coming spring.

The closures will be in place for construction work on retaining walls along the road. During the closures, from March 1st to June 10th, traffic through the construction zone will be managed by traffic signals and flaggers.


Jeff
HikingintheSmokys.com
Read More

Update on Road and Facility Projects in Smokies

Wednesday, May 26, 2010

No comments
Great Smoky Mountains National Park officials have announced new completion dates for several construction projects that are underway to improve park roads and facilities. Severe winter weather conditions and delays in awarding certain contracts have resulted in revised work schedules and opening dates for some of these projects. Many rehabilitation projects, with funding provided by the American Recovery and Reinvestment Act and previously-authorized Federal Lands Highway Program funds, are underway or are soon to start. Extensions of original completion dates have been granted for several of the construction projects as indicated below:

Clingmans Dome Road – Set to open on Saturday, June 19. When the road opens, repaving work will continue on the lower 3 miles of road with one lane closures and flaggers through July 2.

Roaring Fork Motor Nature Trail – A new completion date is to be determined (previously set to open May 28). The work involves resurfacing the 5.6 mile road with asphalt concrete pavement and will include resurfacing all existing parking areas, trailheads, and roadside pullouts.

Heintooga Ridge Road - Set to open Friday, May 28. When the road opens, repaving work will continue with one lane closures and flaggers through August 31.

Balsam Mountain Campground – Set to open on or before Thursday, June 17. Note: Campers should begin checking the status of the campground opening on the Park’s website the week of June 7. The 45-site campground is being repaved.

Sinks Parking Area along Little River Road – Set to open Monday, June 28. The majority of the project involves construction and reconfiguration of the parking area and a new handicap accessible observation platform to view the waterfalls.

Gatlinburg Bypass – The repaving project is on hold and a new construction schedule will be determined.

In addition to the above, the following work is on schedule and provides a snapshot of other projects affecting public use at different levels of disruption:

Foothills Parkway (Blount County) – The road is open, however motorists can expect single lane closures and flaggers with minimal delays. The resurfacing/paving project will be completed on Wednesday, June 30.

Foothills Parkway (Cocke County) – The repaving of this road will begin in late May and is scheduled for completion on Tuesday, August 31. Note: During this period of construction, the road will be closed to all public use for a four week period. The dates of this closure have not been determined but will be posted on the park’s website.

Little River and Jakes Creeks Trailheads – The trailheads will be closed from July 6 through August 31 and will affect trailhead parking. Due to the lack of available trailhead parking, visitors are advised to utilize other Park trails during this period. The trailhead work will result in paved parking spaces.

Newfound Gap Road between Collins Creek Picnic Area and Cherokee, N.C. – This repaving project is slated to be finished in early January 2011.

Smokemont Campground – Set to open Friday, May 28. The 142-campsite is being repaved.

In addition, the construction of bridge 2 on the unopened segment of the Foothills Parkway on the Sevier County end of the “Missing Link” began this spring. All public use (walkers, cyclists, and equestrians) is now prohibited since heavy construction equipment will be traveling the roadway.

Improvements to the Cosby Campground and Cades Cove Loop Road have been completed, as well as the painting and/or reroofing of 65 comfort stations in picnic and campground areas.

The park’s website is the best source for obtaining up-to-date information on the status of the projects and opening dates of facilities and how each project may affect visitor access to certain areas, i.e., trailheads. The site also provides a map outlining the project areas with details on the type of work being accomplished.


Jeff
HikingintheSmokys.com Detailed information on trails in the Smoky Mountains; includes trail descriptions, key features, pictures, video, maps, elevation profiles, news, and more.
Read More

Reminder: Road, Trail and Shelter closings for event

Saturday, August 29, 2009

No comments
As a result of next week's 75th Anniversary Park Rededication Event at the Newfound Gap Parking Area, the Newfound Gap Road (U.S. 441) between Cherokee, NC and Gatlinburg, TN will be closed from sunset on Tuesday September 1 until late afternoon on Wednesday September 2.

This closing will impact several trails, shelters, campsites and other facilities. This includes a section of the Appalachian Trail.

Here are all the places impacted per the Smoky Mountains website:

• US-441 (Newfound Gap Road) between Gatlinburg, TN and Cherokee, NC will be closed from the gate at Sugarlands to the gate at Smokemont, from sunset on Tuesday, September 1 through approximately 6:00 p.m. on Wednesday, September 2.

• Clingmans Dome Road will be closed at the gate at Newfound Gap Road, from sunset on Tuesday, September 1 through approximately 6:00 p.m.on Wednesday, September 2.

• The Newfound Gap parking lot will be closed to all parking from sunset on Sunday, August 30, through approximately 8:00 a.m.on Thursday, September 3.

• The Oconaluftee Overlook will be closed from sunset on Sunday, August 30 through approximately 6:00 p.m. on Wednesday, September 2.

• Note: All facilities reached by Newfound Gap and Clingmans Dome Roads, i.e. the Collins Creek and Chimneys picnic areas as well as trailheads along the roads, will be closed concurrent with the road closures posted above.


Trails Closed:

• The Appalachian Trail (A.T.) will be closed from the Sweat Heifer junction to the Goshen Prong junction, from sunset on Tuesday, September 1 through 6:00 p.m. on Wednesday, September 2.

• The following trails will be closed from sunset on Tuesday, September 1 through 6:00 p.m. on Wednesday, September 2:

> Alum Cave Bluff Trail, entire length, except that persons with a reservation for Le Conte Lodge on September 1 or September 2 will be allowed to use the Alum Cave Bluff Trail for ingress and egress. Lodge guests will be prohibited from driving south of the Alum Cave Bluff trailhead during the Newfound Gap Road closure.

> Chimney Tops Trail, entire length

> Deep Creek Trail, from its junction with the Fork Ridge Trail to the Newfound Gap Road trailhead

> Fork Ridge Trail, entire length

> Forney Ridge Trail, from the junction with the Springhouse Branch Trail to the trailhead at the Clingmans Dome parking area

> Forney Creek Trail, from campsite #69 to the junction with the Forney Ridge Trail

> Kephart Prong Trail, from Newfound Gap Road trailhead to the Dry Sluice Gap Trail

> Noland Divide Trail, from the junction with the Noland Creek Trail to the trailhead on Clingmans Dome Road

> Road Prong Trail, entire length

> Sugarland Mountain Trail, from the junction with the Rough Creek Trail to the terminus at the A.T.

> Sweat Heifer Creek Trail, entire length

> Thomas Divide Trail, from the junction with the Sunkota Ridge Trail to the Newfound Gap Road trailhead


Backcountry Campsites and Shelters Closed:

• Double Springs Gap, Mt. Collins, Icewater Springs, and Kephart shelters will be closed for the nights of Sunday, August 30, through the night of Wednesday, September 2. The shelters will reopen Thursday, September 3.

• Backcountry campsites #53 and 68 will be closed from the night of Monday, August 31 through the night of Wednesday, September 2.


Jeff
HikingintheSmokys.com
Read More

Seasonal Road Openings in the Smokies

Monday, March 9, 2009

1 comment
As a sure sign that spring in the Smokies is just around the corner, several of the seasonal roads in the Smokies will be opening again this weekend, provided, of course, that the region doesn’t experience any late winter snow storms.

Beginning this Friday, March 13, the following seasonal roads will re-open:

• Little Greenbrier Road – just outside of Wears Valley

• Parson Branch Road - Buses, RVs and motor homes are prohibited on this one-way road out of Cades Cove. As a result of heavy rains in December, the Forge Creek Road has been closed for repairs. The road is scheduled to re-open sometime in mid-March according to the National Park website. I assume this will be ready for automobiles to access the Parson Branch Road.

• Rich Mountain - Buses, RVs and motor homes are prohibited on this one-way road out of Cades Cove.

• Roaring Fork Motor Nature Trail - Buses, RVs and motor homes are prohibited on this road outside of Gatlinburg.

• Roundbottom/Straight Fork – near Cherokee, NC.

Additionally, Clingmans Dome Road is scheduled to open on April 1 and the Balsam Mountain and Heintooga Ridge Roads are scheduled to open on May 8.





Jeff
HikingintheSmokys.com Detailed information on trails in the Smoky Mountains; includes trail descriptions, key features, pictures, video, maps, elevation profiles, news, and more.

Smoky Mountain Day Hikers Store Quality gear and apparel from some of the best outdoor brands.
Read More